Search Icon
Search

Change Order
40' Tiara 4000 Express 1995

$ 99,900

Change Order is a Tiara 40' 4000 Express listed for sale with United Yacht Broker Cass Fishbein. Cass can be reached at 1-251-377-6053 to answer any questions you may have on this boat. United Yacht Sales is a professional brokerage firm that has experience listing and selling all types of Express Cruiser and similar boats. With over 165 yacht brokers worldwide, we have the largest network of boat buyers and sellers in the industry.

The 4000 Express was the first mid-cabin design introduced by Tiara and its popularity quickly soared due to its sleek profile, lush interior, wide open cockpit, and excellent layout. The Tiara 4000 Express’s wide beam allows for spacious accommodations with a huge salon lounge, extendable table, open galley with separate freezer and refrigerator, and more storage than you will find on much larger boats.


Tiara has always been known for luxurious interiors, and the 4000 Express does not disappoint: wood flooring and wall coverings give a rich feel, with plenty of headroom in the mid-cabin and throughout. Wide seating area at the helm deck provides an excellent 360 degree view, with plentiful additional seating in the cockpit.


Doors to either side of the cavernous ram-assisted storage trunk at the transom, provide access to the large swim platform. Engine access is provided through the center seat of cockpit when folded up.


CAT 3208 Silver Anniversary Edition Diesels 435hp and Phasor/Kubota 8kw generator provide reliable mechanical and electrical power. Numerous recent upgrades include exterior cushions, bimini top, and three sided clear enclosure as well as a Lowrance HOOK9 GPS Plotter/Color fish finder. “Change Order” has been well cared for by her knowledgeable owner and is seriously for sale. Please see full specs for a full list of 2018 and 2019 repairs, updates, and service!


Change Order” is one of the finest examples of a Tiara 4000 Express on the market today!

Specifications

  • Price: $ 99,900
  • Builder: Tiara
  • Model: 4000 Express
  • Location: Orange Beach, Alabama, United States
  • Type: Power
  • LOA: 46 ft 0 in
  • Display Length: 40 ft
  • Beam: 14' 6"
  • Category: Express Cruiser
  • Water Capacity: 160 gals
  • Fuel Capacity: 444 gals
  • Engine Details: Caterpillar 3208 Silver Anniversary Edition
  • Engine 1: 1450.00 HRS 435.00 HP
  • Engine 2: 2480.00 HRS 435.00 HP
  • Engine Fuel: Diesel
  • (3) wood steps down to main salon from helm deck entry door
  • 12v lighting
  • Galley to port
  • Guest stateroom to starboard midship
  • Large U-shaped leather dinette/lounge to starboard (cream color)
  • Wood flooring and wall coverings throughout the boat
  • Vinyl headliner
  • Master stateroom forward with head/shower to port (dual entry doors from salon or master)
  • Samsung flatscreen tv
  • Klipsch sound bar speaker
  • Marine Air Systems air conditioner
  • 110v outlets
  • Tri-fold table at U-shaped dinette
  • Barstool w/ dedicated floor mounting hardware
  • Wood flooring & wall coverings
  • Granite countertops
  • Stainless steel sink
  • Faberware toaster oven
  • Avanti microwave oven
  • Ample storage throughout
  • (2) burner Kenyon electric stove
  • Frigidaire refrigerator
  • Separate freezer w/ mirrored face
  • 110v outlets
  • Separate Marine Air Systems AC
  • (2) Cedar lined hanging lockers
  • Centerline berth
  • Poly Planar speakers
  • Storage

  • 12v lighting

  • Privacy door to salon

  • Carpeted lower wall coverings

  • Wood upper wall coverings

  • Wood flooring

  • Dual entry doors from Salon or Master Stateroom
  • Vacuflush head
  • Separate shower w/ clear door & molded fiberglass liner w/ seat
  • (2) Mirrors
  • Sink w/ faucet
  • Storage
  • 110v outlets
  • 12v lighting
  • Towel rack
  • 110v outlet
  • Samsung flat screen tv
  • Ample storage
  • Double berth
  • Mirror
  • Sink/Faucet
  • Jump seat
  • Porthole to helm area
  • AC vent
  • 12v lighting
  • Huge storage trunk/locker at transom on actuators
  • Stern light
  • Nav/Anchor lights
  • Swim platform w/ ladder
  • Freshwater hot/cold shower at transom
  • Premium diamond nonskid
  • Stainless hardware: bow rail, cleats, transom gates, hawse pipes
  • Engine room access through cockpit (center seat-hatch)
  • (3) bow hatches w/ canvas covers
  • Sun pad
  • Winshield wipers
  • Windshield vent w/ actuator
  • Courtesy lighting
  • Molded in steps to gunwhale port & stbd
  • Arch w/ bimini top and (3) sided enclosure
  • (2) 12v spreader lights
  • Anchor locker
  • Anchor w/ chain
  • Windlass w/ foot controls
  • (4) Lee stainless fishing rod holders
  • Cockpit sink
  • Storage
  • Saltwater/raw washdown
  • Sony Stereo
  • Pioneer speakers
  • Cupholders
  • Dual engine controls
  • Power helm seat
  • Clear chart holder centerline
  • Ritchie powerdamp compass
  • Lowrance Hook9 color GPS/Plotter & Fishfinder
  • Simrad AP22 autopilot
  • Raymarine Ray215 DSC VHF
  • 110v system
  • 12v system
  • Mastervolt Powercharge 12/40-3 battery charger
  • (4) 8-D batteries
  • Hot water heater
  • Shorepower system w/ 50amp cord & twin 30amp splitter
  • Phasor-Kubota K3 diesel generator 8.0kw 840hrs
  • Twin CAT 3208 435hp Silver Anniversary Edition diesel engines: P-1450hrs  S-2480hrs
  • Dripless shaft seals
  • Dual Racor fuel/water separator filters per engine
  • Trim tabs
  • Bottom paint
  • Props laser aligned and coated with Prop-speed
  • Bennett trim tabs
  • Bennett trim tab rams
  • New zincs
  • (4) New 8d batteries
  • (1) New 4d battery
  • Rebuilt main engine raw water pumps
  • Maine engines and generator serviced
  • New fresh water supply pump
  • Air Conditioners serviced 
  • All new bilge pumps forward to aft
  • VacuFlush head for master stateroom
  • Hot water heater
  • New underwater lights
  • New Air conditioner raw water pump
  • New air conditioner raw water strainer
  • New canvas top
  • New isinglass
  • New radio and speakers
  • New Klipsch sound bar and subwoofer
  • New flat screen tv in in guest stateroom
  • New TruePower Combi 2500w QS Inverter/Charger
  • Heat exchangers cleaned
  • Aftercoolers cleaned
  • New engine belts

Engine hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.

The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.

RELATED YACHTS

photo of

SLOWLY FOUR

60' Tiara 5800 Sovran 2008

La Spezia, Italy

photo of

Our Trade

58' Tiara 5800 Sovran 2012

St. Petersburg, Florida, United States

photo of

Esperanza

58' Tiara 58 Sovran 2010

Dania Beach, Florida, United States