Search Icon
Search

Change Order
38' Out Island 38 Express Fisherman 2003

$ 195,000

Change Order is a Out Island 38' 38 Express Fisherman listed for sale with United Yacht Broker Joe Longobardi. Joe can be reached at 1-410-490-0584 to answer any questions you may have on this boat. United Yacht Sales is a professional brokerage firm that has experience listing and selling all types of Saltwater Fishing and similar boats. With over 165 yacht brokers worldwide, we have the largest network of boat buyers and sellers in the industry.

An extremely nice example of a 38 Out Island, with reliable 450 Cummins power, lift kept in brackish water. Super clean with continual updating, including a new EZ2CY enclosure and rebuilt generator in 2016, this pretty boat is ready to fish.


Specifications

  • Price USD:$ 195,000
  • Builder: Out Island
  • Model: 38 Express Fisherman
  • Location: Pasadena, Maryland, United States
  • Type: Power
  • LOA: 38 ft 0 in
  • Display Length: 38 ft
  • Beam: 14' 2"
  • Category: Saltwater Fishing
  • Water Capacity: 112 gals
  • Fuel Capacity: 503 gals
  • Engine Details: Cummins 6CTA 8.3
  • Engine 1: 2003 2350.00 HRS 450.00 HP
  • Engine 2: 2003 2350.00 HRS 450.00 HP
  • Engine Fuel: Diesel

*Engine hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.

The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.

RELATED YACHTS

Photo of 38' Out Island 38 Custom Carolina 2006

Superbowl Fishing

38' Out Island 38 Custom Carolina 2006

Pensacola, Florida, United States

Photo of 38' Out Island 38 Express 2014

Galati Yacht Sales Trade

38' Out Island 38 Express 2014

Anna Maria, Florida, United States

Photo of 38' Out Island 38 Express Fisherman 2004

Barbarossa

38' Out Island 38 Express Fisherman 2004

FT. LAUDERDALE, Florida, United States