Search Icon
Search


38' Fountain Center Console TE 2004/2012 2004

$ 129,900

is a Fountain 38' Center Console TE 2004/2012 listed for sale with United Yacht Broker Chuck Newman. Chuck can be reached at 1-904-607-7286 to answer any questions you may have on this boat. United Yacht Sales is a professional brokerage firm that has experience listing and selling all types of Center Consoles and similar boats. With over 165 yacht brokers worldwide, we have the largest network of boat buyers and sellers in the industry.

2004/2012 38' FOUNTAIN

This 2004 38' Fountain is in nice condition. She has been repowered with desirable triple 300hp Yamaha 4-strokes (275 hours).

Seller is looking for an offer.

Specifications

  • Price: $ 129,900
  • Days on Market: 725
  • Builder: Fountain
  • Model: Center Console TE 2004/2012
  • Location: Naples, Florida, United States
  • Type: Power
  • LOA: 38 ft in
  • Display Length: 38 ft
  • Beam: 10' 6"
  • Category: Center Consoles
  • Water Capacity: 30 gals
  • Fuel Capacity: 300 gals
  • Engine Details: Yamaha 4 Stroke
  • Engine 1: 2012 275.00 HRS 300.00 HP
  • Engine 2: 2012 275.00 HRS 300.00 HP
  • Engine 3: 2012 275.00 HRS 300.00 HP
  • Engine Fuel: Gas/Petrol
  • Cabin with Cushions
  • Lighting
  • Plexiglass Doors

Head:

  • Head in Console
  • Sink
  • (6) Gunwale Rod Holders
  • (4) Under Gunwale Holders
  • Aft Bench Seat with Livewell
  • Fresh Water Washdown
  • Raw Water Washdown
  • Armstrong Ladder
  • 30 AMP Shore Power
  • Bilge Pumps
  • Large Fishboxes
  • Macerator
  • Transom Door
  • Cleats
  • Transom Sink
  • Coaming Pads
  • Stainless Bow Rail
  • Anchor
  • Large Center Console
  • T-Top
  • Seat in Front of Console
  • Head in Console
  • Plexiglas Window
  • Large Helm Seat for Two
  • Cup Holders
  • Overhead Radio Box
  • Steering Wheel
  • Yamaha Gauges
  • Glove Box
  • Yamaha Electronic Controls
  • Horn
  • Trim Tabs
  • Courtesy and Spreader Lights
  • (2) Standard Horizon VHF's
  • Remote VHF Speaker
  • Garmin 5212
  • Garmin HD Radar
  • (4) JL Audio Speakers
  • Fusion Stereo
  • Furuno RD30
  • Simrad Ap24 Autopilot

*Engine hours are as of the date of the original listing and are a representation of what the listing broker is told by the owner and/or actual reading of the engine hour meters. The broker cannot guarantee the true hours. It is the responsibility of the purchaser and/or his agent to verify engine hours, warranties implied or otherwise and major overhauls as well as all other representations noted on the listing brochure.

The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.

ABOUT THIS YACHT

Our Fountain listing is a great opportunity to purchase a very nice 38' Center Console TE 2004/2012. She is currently listed with United Yacht Sales broker Chuck Newman who can answer all questions about the boat for you. Please don't hesitate to reach out to our team of professional yacht brokers to schedule a showing. There are many yachts listed for sale on the MLS each with a different history. We look forward to helping you complete your search for the perfect boat or yacht for sale.

SELL YOUR YACHT WITH UNITED

United is the largest professional yacht brokerage firm in the world with over 150 yacht brokers in our network. By listing your boat or yacht for sale with us, all 150+ brokers on our team will be notified immediately which greatly increases the chances that your boat may sell before it ever even hits the market. With hundreds of used boats and yachts sold each year, there is no better team than United to help with the listing and sale of your vessel.

BUY A YACHT WITH THE UNITED TEAM

Buying a boat or yacht can be a daunting experience with so many available boats on the market. Let the team at United take the guesswork out of your boat search by enlisting one of our professional yacht brokers. Not only will we listen to your needs about budget, docking and storage, and how you plan on using your new boat, but we will do the research for you by looking through the MLS, researching the history of every listing, and negotiating on your behalf. From survey to acceptance, the team at United Yacht Sales is with you every step of the way.

RELATED YACHTS

photo of

48' Fountain 48 Express Cruiser 2007

Fort Myers, Florida, United States

photo of

48' Fountain 48 Express Cruiser 2005

Fort Lauderdale, Florida, United States

photo of

Hi Gear

48' Fountain 48 Express 2004

Falmouth, Massachusetts, United States

query
  CreatedTimestamp Description Featured HD ID Large Medium Sort Thumbnail Title UpdatedTimestamp
1 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_74093581_1.jpg 373843 https://media.iyba.pro/images/2713334_74093581_1.jpg https://media.iyba.pro/images/medium/2713334_74093581_1.jpg 1 https://media.iyba.pro/images/thumbnails/2713334_74093581_1.jpg Profile [empty string]
2 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_165072a5_1.jpg 373844 https://media.iyba.pro/images/2713334_165072a5_1.jpg https://media.iyba.pro/images/medium/2713334_165072a5_1.jpg 2 https://media.iyba.pro/images/thumbnails/2713334_165072a5_1.jpg Cabin Entry and Foredeck [empty string]
3 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_70704f98_1.jpg 373845 https://media.iyba.pro/images/2713334_70704f98_1.jpg https://media.iyba.pro/images/medium/2713334_70704f98_1.jpg 3 https://media.iyba.pro/images/thumbnails/2713334_70704f98_1.jpg Head [empty string]
4 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_20a9054f_1.jpg 373846 https://media.iyba.pro/images/2713334_20a9054f_1.jpg https://media.iyba.pro/images/medium/2713334_20a9054f_1.jpg 4 https://media.iyba.pro/images/thumbnails/2713334_20a9054f_1.jpg Center Console [empty string]
5 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_0f3d267f_1.jpg 373847 https://media.iyba.pro/images/2713334_0f3d267f_1.jpg https://media.iyba.pro/images/medium/2713334_0f3d267f_1.jpg 5 https://media.iyba.pro/images/thumbnails/2713334_0f3d267f_1.jpg Forward Seating [empty string]
6 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_ad397bd2_1.jpg 373848 https://media.iyba.pro/images/2713334_ad397bd2_1.jpg https://media.iyba.pro/images/medium/2713334_ad397bd2_1.jpg 6 https://media.iyba.pro/images/thumbnails/2713334_ad397bd2_1.jpg Cockpit [empty string]
7 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_1c23e525_1.jpg 373849 https://media.iyba.pro/images/2713334_1c23e525_1.jpg https://media.iyba.pro/images/medium/2713334_1c23e525_1.jpg 7 https://media.iyba.pro/images/thumbnails/2713334_1c23e525_1.jpg Aft Seat [empty string]
8 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_3f62f592_1.jpg 373850 https://media.iyba.pro/images/2713334_3f62f592_1.jpg https://media.iyba.pro/images/medium/2713334_3f62f592_1.jpg 8 https://media.iyba.pro/images/thumbnails/2713334_3f62f592_1.jpg Helm [empty string]
9 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_1bdb0a33_1.jpg 373851 https://media.iyba.pro/images/2713334_1bdb0a33_1.jpg https://media.iyba.pro/images/medium/2713334_1bdb0a33_1.jpg 9 https://media.iyba.pro/images/thumbnails/2713334_1bdb0a33_1.jpg Helm [empty string]
10 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_b9ba9ad8_1.jpg 373852 https://media.iyba.pro/images/2713334_b9ba9ad8_1.jpg https://media.iyba.pro/images/medium/2713334_b9ba9ad8_1.jpg 10 https://media.iyba.pro/images/thumbnails/2713334_b9ba9ad8_1.jpg Helm [empty string]
11 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_cc75ea45_1.jpg 373853 https://media.iyba.pro/images/2713334_cc75ea45_1.jpg https://media.iyba.pro/images/medium/2713334_cc75ea45_1.jpg 11 https://media.iyba.pro/images/thumbnails/2713334_cc75ea45_1.jpg T-Top [empty string]
12 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_da2c306f_1.jpg 373854 https://media.iyba.pro/images/2713334_da2c306f_1.jpg https://media.iyba.pro/images/medium/2713334_da2c306f_1.jpg 12 https://media.iyba.pro/images/thumbnails/2713334_da2c306f_1.jpg Center Console [empty string]
13 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_e57991f2_1.jpg 373855 https://media.iyba.pro/images/2713334_e57991f2_1.jpg https://media.iyba.pro/images/medium/2713334_e57991f2_1.jpg 13 https://media.iyba.pro/images/thumbnails/2713334_e57991f2_1.jpg Engines [empty string]
14 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_ac36dac3_1.jpg 373856 https://media.iyba.pro/images/2713334_ac36dac3_1.jpg https://media.iyba.pro/images/medium/2713334_ac36dac3_1.jpg 14 https://media.iyba.pro/images/thumbnails/2713334_ac36dac3_1.jpg Engines [empty string]
15 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_53360832_1.jpg 373857 https://media.iyba.pro/images/2713334_53360832_1.jpg https://media.iyba.pro/images/medium/2713334_53360832_1.jpg 15 https://media.iyba.pro/images/thumbnails/2713334_53360832_1.jpg Port Aft Quarter [empty string]
16 [empty string] [empty string] Yes https://media.iyba.pro/images/highdef/2713334_e79ca79c_1.jpg 373858 https://media.iyba.pro/images/2713334_e79ca79c_1.jpg https://media.iyba.pro/images/medium/2713334_e79ca79c_1.jpg 16 https://media.iyba.pro/images/thumbnails/2713334_e79ca79c_1.jpg Starboard Quarter [empty string]